The rc branch previously derived the base version from the highest git tag, which reopened an already-shipped series: after v1.3.21 stable was published, cutting an RC still produced v1.3.21-rc.N. Anchor RCs to latest_stable + patch so a fresh RC after v1.3.21 correctly resolves to v1.3.22-rc.0. Minor/major RCs are cut by running that stable kind first, which is a clearer workflow than the old heuristic. Co-authored-by: Orca <help@stably.ai> |
||
|---|---|---|
| .. | ||
| ISSUE_TEMPLATE | ||
| workflows | ||
| pull-request-size.yml | ||
| pull_request_template.md | ||